CLOUD

A Practical Cloud Migration Checklist for Kenyan SMEs

· 5 min read

Cloud migration projects fail most often not because the technology is wrong, but because the decision to migrate was made before the right questions were answered. Moving workloads to AWS, Azure, or Google Cloud is straightforward once the groundwork is done — but the groundwork matters more than the migration itself.

Questions to answer before you decide

Before committing to a cloud migration, get clear answers to these:

Choosing a provider for Kenya

All three major providers now have African-region infrastructure:

For most Kenyan businesses, the latency difference between these providers is small — all three African regions are substantially better than routing to Europe or the US. Choose based on which services align with your workloads and which platform your team already knows.

The 6 Rs: how to categorise each workload

Before migrating anything, classify each workload using the 6 Rs framework:

Most migrations are a mix of all six. Don't assume everything goes to the cloud.

Kenya-specific considerations

Load shedding resilience. Cloud-hosted systems continue running during power cuts at your offices. This is a genuine operational advantage in Kenya — your email, file storage, and applications stay available even when your office has no power.

Egress costs. Cloud providers charge for data leaving their networks. If you have high-bandwidth workloads — video, large file transfers, media processing — model your egress costs carefully before committing.

Support time zones. Ensure your cloud provider's support plan covers East African Time business hours (UTC+3). Many default enterprise support plans are US-timezone-centric.

Internet redundancy before cloud migration. If your cloud adoption increases dependency on internet connectivity, establish redundancy first. A primary fibre ISP plus a 4G/5G failover is a minimum reasonable setup for a cloud-dependent office.

Pre-migration checklist

Migration projects that skip the parallel running period and the rollback planning are the ones that cause unplanned outages. Budget time for both.

← Back to blog

CLOUD SERVICES

Planning a cloud migration?

We can assess your environment, help you choose the right workloads to migrate first, and manage the move to AWS, Azure, or GCP.

See our cloud service →

More from the blog

PROJECT MANAGEMENT

Technical Project Manager: Monoliths vs Microservices Architecture

IT SUPPORT

What IT Support Looks Like for a Small Business in Kenya